Automotive OEM Leipzig:
supplier management, claim management
supplier management, claim management
TIER 1 Automotive:
analysis of dust inclusions, optimization solutions paint shop
analysis of dust inclusions, optimization solutions paint shop
Automotive OEM Munich:
Support ramp-up, increase R@R paint line, analysis technical cleanliness.
Support ramp-up, increase R@R paint line, analysis technical cleanliness.
TIER 1 Nutzfahrzeuge Heilbronn:
Project manager “New paint shop” Planning and realization, budget € 4.9 million
Project manager “New paint shop” Planning and realization, budget € 4.9 million
Technology group coating materials and innovative plastics:
Interim Head of Technology / Coating Application Center, Head of Application Engineering and Industrial Engineering
Interim Head of Technology / Coating Application Center, Head of Application Engineering and Industrial Engineering
Chemical Technology Munich:
Product Management Coating Technology SiO2 Thin Film Coating. Procurement of operating resources and planning and implementation of production expansion at Pfungstadt plant.
Product Management Coating Technology SiO2 Thin Film Coating. Procurement of operating resources and planning and implementation of production expansion at Pfungstadt plant.
Automotive OEM Düsseldorf:
KTL plant van production failure analysis
KTL plant van production failure analysis
Automotive OEM Berlin:
Feasibility study coating system change water-based vs. solvent-based top coat
Feasibility study coating system change water-based vs. solvent-based top coat
Powder coating manufacturer Switzerland:
Feasibility analysis wet paint Germany
Feasibility analysis wet paint Germany
TIER 1 Automotive Munich LK:
Research into alternative coating systems Hardcoat Verification Sample processing
Research into alternative coating systems Hardcoat Verification Sample processing
TIER 1 Automotive Bayern:
Manufacturer of functional elements for vehicle interiors: process optimization printing and forming aluminum
Manufacturer of functional elements for vehicle interiors: process optimization printing and forming aluminum
Consulting GmbH:
Calculations to determine supplier development costs (LEK) in the areas of exterior/interior and engine parts
Calculations to determine supplier development costs (LEK) in the areas of exterior/interior and engine parts
Automotive OEM Munich QM:
Process optimization/supplier management Door seal profiles in Slovakia
Process optimization/supplier management Door seal profiles in Slovakia
Motorcycle OEM Berlin:
support DLL 2, plausibility check implementation 10 points action plan motorcycle
support DLL 2, plausibility check implementation 10 points action plan motorcycle
TIER 1 Commercial Vehicles Krefeld:
Support project management conceptual design “New paint shop” €4.2 million
Support project management conceptual design “New paint shop” €4.2 million
Automotive OEM Munich:
Conceptual design of technical solution for cavity preservation for foreign plant, bid evaluation and supplier selection
Conceptual design of technical solution for cavity preservation for foreign plant, bid evaluation and supplier selection
Chemical Technology Munich:
Interim Manager Project Management / Product Manager Tasks: Project management relaunch of a product line for extended corrosion protection for stainless steels with subsequent SiO2 – coating/series start-up.
Interim Manager Project Management / Product Manager Tasks: Project management relaunch of a product line for extended corrosion protection for stainless steels with subsequent SiO2 – coating/series start-up.
Manufacturer of optical products:
Planning support “Google Glasses”: Production planning/procurement of operating resources/series start-up Plastic tip molding Technical lenses/concept and procurement Sprue milling system
Planning support “Google Glasses”: Production planning/procurement of operating resources/series start-up Plastic tip molding Technical lenses/concept and procurement Sprue milling system
Paint shop Ludwigsburg area:
Interim deputy plant management Tasks: Support of the GF in the plant management Re-certification according to TS 16949
Interim deputy plant management Tasks: Support of the GF in the plant management Re-certification according to TS 16949
TIER 1 Automotive:
Adhesive coating of rubber-metal parts at Polish site (near Wroclaw), plant productivity/process optimizations/work organization (Kaizen, CIP) /quality assurance(MFK) /process optimizations
Adhesive coating of rubber-metal parts at Polish site (near Wroclaw), plant productivity/process optimizations/work organization (Kaizen, CIP) /quality assurance(MFK) /process optimizations